Project description:

Project Controls Specialist, Reviewed and analyzed the contract phasing specification and performed baseline schedule analysis for the construction of the in-line baggage handling systems for the North Terminals Project at the Los Angeles International Airport. Reviewed and back-checked construction documents and assisted in the development of the E20/20 electronic document control management system, which included correspondence, RFI, RFC, submittals, and field management systems.